Billing of Quantities (BOQ) | Types
RCC roads = 0.6% concrete volume; Assuming 2.5% as the steel reinforcement required, the formula to calculate steel is: 2.5/(100×1)×7850=196.25 kg. Estimation of labour for reinforced concrete. The requirement for labour as per the specified quantity of work is as follows: Mason – 0.37 day; Unskilled labour – 3.5 days; …
اقرأ أكثرSession 7 : RCC Work (Footing/Raft Foundation) …
The following are the procedures to take and write the measurements of RCC. If the Size of Footing is 1500 mm X 1500 mm and thickness is given 600 mm, Then we can calculate two types of …
اقرأ أكثرReinforcement steel requirement for R.C.C Elements
Steel requirement will depending on the quantity of water to be stored and height of tank from ground level . Wind effect to be considered to finalize e the design . (7) Steel requirement for an R.C.C wall of a Water storage tank below ground level . Steel requirement for this tank will be less than that of an over head tank .
اقرأ أكثرMethods of Reinforcement Quantity Estimation in Concrete …
Methods of Reinforcement Quantity Estimation: There are different methods for estimating the quantities of reinforcement; three methods of varying accuracy are: …
اقرأ أكثرThumb Rules Formula for Civil Engineers & Quantity Surveyors
Step 1: Calculate the Volume of Concrete: The Total Volume of Concrete for given Slab = 5 x 4 x 0.15. = 3m3. Step 2: Calculate The Steel Quantity Using Formula: As per the guidelines are given in the BN Dutta reference book the steel quantity of slab is 1% of the total volume of concrete utilized. Thumb rule to estimate Steel quantity of above ...
اقرأ أكثرRecommended Details for Reinforced Concrete …
Requirements for columns with spiral reinforcement are given in ACI 318 Sections 10.7.6 and 25.7.3. Standard spiral sizes are #3 to #5, and the clear spacing between consecutive turns on a spiral must not exceed 3 …
اقرأ أكثرBusiness Administration
Business administration is the management of small, mid-size, and large businesses. The objective is to prepare students with the knowledge, technical skills, and work habits to pursue positions in various business fields. The curriculum provides a solid foundation in general business. Study in this area will help students develop teamwork and ...
اقرأ أكثرRCC Column Construction
Basically a RCC column is a compression member which takes on its longitudinal axis. The bending moment on the column is due to the wind forces and the sudden massive loads like earthquakes etc.. The size, shape, quantity of the materials used like cement, sand,aggregate, reinforcement details etc are mentioned in the …
اقرأ أكثرWater Tank Material Calculation | RCC Water Tank Estimate
Diagram representation for section/side view - RCC water tank is circular. Plain cement concrete = 1:2:4 with thickness = 10 cm. RCC = 1:2:4 with thickness = 10 cm. Opening for water tank is 60 cm with thickness = 10 cm. Thickness of RCC walls = 15 cm. 1% of 4M bars is used in wall.
اقرأ أكثرTMT Bars required in RCC for Foundation, Beam, Slabs
1 : 1 : 2. 25 N/mm2 or 250 Kg/cm2. TMT Bar adds strength to the RCC. Various elements of RCC constructions are slabs, beams, foundation etc. It is always recommended to maintain the accurate ratio as per the type of construction. TMT Bar is the main component in RCC that gives the tensile strength to your home.
اقرأ أكثرReinforced Cement Concrete (RCC)
Definition of Reinforced Cement Concrete. Reinforced Cement Concrete (RCC) is a composite building material consisting of structural concrete reinforced with a …
اقرأ أكثر50 Construction Thumb Rules used by Civil Engineers
Thus Total concrete quantity required to build an 800sqft house is – 30.4m3. Thumb Rule 3: Thumb Rule For Steel Quantity Required for Slab, beam, footing & columns. Construction Thumb Rules. For residential buildings – 4.5 to 4.75kg/-Sqft. For commercial buildings – 5 to 5.50kg/-Sqft Or 80 to 150kg/m3.
اقرأ أكثرRCC Quantity Calculator -Efficiently Calculate RCC …
Formula for Calculation. Quantity of Materials in Kgs = Dry Volume of Materials X (Portion of materials in Ratio / Sum of Ratios ) X Density of Materials. 1, Quantity of Cement in 1 CUM Concrete is = 1.54x 1/7 x 1440 = 316.80 Kgs. 2, Quantity of Sand in 1 CUM Concrete is = 1.54 x 2/7 x 1450 = 638.00 Kgs. 3, Quantity of …
اقرأ أكثرSize and Quantity of Reinforcement for Building Works
Quantity of reinforcement per cubic meter of concrete and its suitable size is discussed. Join. Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. ... RCC Member: Quantity in kg/m 3: Size of reinforcement required: 1: Column footings: 75: 10mm or 12mm: 2: Grade beams: 100: 12mm, 16mm – 85% ...
اقرأ أكثرRequirements of Water for Curing of Concrete
The higher amount of water is essential to continue the hydration process in spite of making a concrete. Usually hydration process will continue up to 21 days (for small structure i.e. houses) or more (for mass concrete structure i.e. RCC dam). Hence, concrete requires water continuously up to 21 days, to get rid of dryness, and to retain humidity.
اقرأ أكثرHow to Calculate Steel in RCC Slab?
As per thumb rule steel quantity required in the formation of RCC beam should be 2% of total volume of concrete. To calculate the steel quantity in beam as 2% of volume of concrete = 0.02 x 7850 x 5.29 = …
اقرأ أكثرRate Analysis of RCC (Reinforcement Cement …
10 cu.m. concrete requirement of sand = 0.443 Cu.m x 10 cu.m. = 4.43 cu.m. ... water, and other materials needed for the construction of RCC beams. The quantity and rates of these materials depend on …
اقرأ أكثرThumb Rules In Building Construction For Civil Engineers
Steel Requirement thumb rule. Example of steel requirement. Calculate steel requirement of slab of dimension 3m X 5m X 0.15m. Total volume of concrete = 3 x 5 x 0.15 = 2.25 m3. Steel required = 2.25 X 1% …(1% taken from table for slab) =0.0225 m3. For weight of steel, multiply by the density of steel which is 7850kg/m3.
اقرأ أكثرBrickWork Calculation & Calculator | Quantity of Sand, …
Similarly as Cement, Sand is calculated in terms of m 3. The Amount of Sand required for Brick masonry = Dry volume of mortar x 6/7 = 0.420 x 6/7 = 0.36m 3. In terms of Kgs, Density of Sand = 1600Kgs/m 3. For 0.36 = 0.36x 1600 = 576Kgs. Summary: For Brickwork of 10′ x 10′ where each Size of brick = 9″x 4″x3″.
اقرأ أكثرDesign of RCC Column | RCC Column with Foundation
The following steps outline the process of RCC column size calculation: 1. Determine the Design Loads: The first step is to identify and calculate the design loads on the column. These loads can include dead loads (e.g., self-weight of the column and superimposed loads), live loads, wind loads, and seismic loads.
اقرأ أكثرJSW Neosteel Steel Calculator
Explore a collection of all technical details you require while designing an RCC structure. Contractor Zone. Explore the best construction related practices and guidelines. Find Engineer/ Contractor. Locate a JSW authorized engineer and/ or a JSW authorized contractor. FAQs. Answers to some frequently asked questions about Neosteel
اقرأ أكثرHow much steel required for 1000 sq ft roof slab?
Thumb rule for Steel required for RCC slab is 80 kg/m3, then quantity of steel required for 1000 sq ft ( 9.44 m3) rcc slab is equal to = 80 × 9.44 = 750 kg. At 4″ thickness, the total amount of steel required for 1000 sq ft (9.44 cubic meters) of RCC roof slab is equal to = 80 × 9.44 = 750 kg. This means, 750 kg of steel is needed per 1000 ...
اقرأ أكثرSteel Quantity Calculator | Steel Weight Calculator | Weight Calculator
Weight of steel in ton. 2.40 ton. Steel Quantity Calculation. Steel quantity = Member type×Concrete qauntity Steel quantity = Member type × Concrete qauntity. Steel quantity =80×30 Steel quantity = 80 × 30. Total Quantity = 2400.00 kg or 2.40 ton.
اقرأ أكثرThumb Rules Used In Construction
Now, calculating the quantity of steel = total volume of concrete x density of steel x 0.01. = 7.2m3 x 7850 kg/m3 x 0.01. = 565.2 kg. The total quantity of steel required in the given slab is 565.2 kg. Similarly for other structural components, the quantity of steel can be worked out. Note – it is found that for 1000 kg of steel (1000 kg = 1 ...
اقرأ أكثرRCC Dam Construction
RCC gravity dam construction can also be used to build self-contained embankments. Taum Sauk Dam, in Reynolds County, MO, is an outstanding example—with a total length of over 1 mile (1.6 km), it holds the U.S. record for the quantity of RCC placed for a dam. The structure contains a hydroelectric pumped storage reservoir atop Proffit …
اقرأ أكثرMaterial Estimate of an RCC Underground Water Tank
Opening for water tank is 60 cm with thickness = 10 cm. Thickness of RCC walls = 15 cm. 1% of 4M bars is used in wall. Depth of wall = 3 meter. Diameter of center hole/circle = 4 m. Diameter of extra wall is 15 cm. Diameter of outer wall is 10 cm. Diameter, of center is the hole in section = 4.15 cm up to the wall. Diameter of PCC = 4.5 cm.
اقرأ أكثرHow much cement sand & aggregate required …
1m3 m25 concrete weight: unit weight of RCC is 2500kg/m3 and PCC is 2400kg/m3, so weight of 1m3 M25 concrete is 2500kgs when used as reinforced cement concrete and 2400kgs in plain cement concrete. …
اقرأ أكثرA Complete Guide To Reinforced Cement Concrete
Reinforced Cement Concrete (RCC), commonly known as reinforced cement concrete, is a versatile and widely used construction material that combines the strength of concrete with the flexibility and tensile strength of steel reinforcement.It has revolutionized the way we build structures, offering a reliable and durable solution for a wide range of applications.
اقرأ أكثرCalculate Quantities of Materials for Concrete
Thus, the quantity of cement required for 1 cubic meter of concrete = 0.98/0.1345 = 7.29 bags of cement. The quantities of materials for 1 m3 of concrete production can be calculated as follows: The weight of cement …
اقرأ أكثرCalculate quantity of cement, Sand & Aggregate In RCC …
In this construction video tutorial, we will learn how to calculate the quantity of cement, sand and aggregate in RCC slab. Assume a slab having length = 5 m and breadth = 3 m and thickness = 10 cm. Compacted volume of slab = 3 x 5 x 10/100 = 3 x 5 x 0.1 = 1.5 m 3. Change the volume into loose volume which is = 1.54 x 1.5 = 2.31 m 3.
اقرأ أكثر